Assistance
Checklist for Starting or
Expanding a Business in
Abington Township
Checklist for starting a business
New Business
Visit the
Economic Development
Office for process overview, grant
opportunities, loan information, and registration
for our business Website and
Business Directory.
Zoning
Review: Visit with the Zoning Official to
determine use approval prior to
any occupancy.
Zoning
Hearing Board: A hearing
may be required if the intended use does not
comply with Zoning Use Codes.
Business License: Apply
for a Mercantile or Business Privilege License with
the Tax Office prior to opening.
Sign Permit: Submit a sign
plan and permit application to the Code Department
prior to ordering or erecting a new sign, or
changing any existing sign.
Certificate of Occupancy:
Apply for an occupancy permit at the Code
Department prior to using any
building
or opening the business.
Note:
This column checklist
assumes the building will be used as is, without tenant
layout or egress changes. If such changes are proposed, proceed to the
With
Construction checklist now.
Business Expansion
Visit
the
Economic Development Office
for process overview, grant
opportunities, loan information, Tax Abatement
Application and registration for our
business Website and Business Directory.
Zoning
Review: Visit with the
Zoning Official to determine expansion rights under
the applicable zoning regulations.
- If the Zoning Official
determines variances are needed, the plan preparation
step
below would be completed in
preparation for a trip to the Zoning Hearing Board.
Plan
Preparation: A major
expansion will require professional architectural and
site plans. Visit architectural and engineering
firms to develop appropriate plans.
Our Township Engineering Office may be able to
provide site plan data already on
file with the Township.
Land
Development Review: Submit
application and land plans to the Township
Zoning and Planning Official for ultimate review
by the Planning Commission, Code
Enforcement Committee, and full Board of
Commissioners. This process can take
up to 90 days or longer.
Note:
Some minor land development applications
may not need LD Review as the
Official may determine. Assuming the proposed project is approved via the
process
above, proceed to the
With Construction
checklist now.
With Construction
Building
Permit: Apply directly to the Township Code Department
for the
appropriate building permit applications as the
proposed construction may require.
Separate permit review and issuance is required
for the following categories:
• Electrical Installations
• Fire Alarm and
Sprinklers
• Final Use and Occupancy
• General Construction • Mechanical or HVAC
Work • Other applicable permits
as determined by the Code
Department.
Montgomery
County Health Department:
Apply directly to the County
for
review and approval required for most food and
beverage establishments. Contact
them prior to plan generation,
ADA
Compliance: ADA guidelines
are reviewed by a separate outside agency.
Information is available at the Code Department.
If
applicable, return to the Economic Development Office
for grant and tax
abatement processing at this time.
Note:
See Township Contacts page for agency names and phone
numbers.